Every template below is a real, working Gantt chart, not a picture of one. The phases, task durations, dependencies and milestones are already set up. Open one to see how it is put together, or copy it into your own account and change the dates to yours. Everything here is free and there is nothing to install.
General-purpose plans that work for most projects. Start here if you are not sure which one you need.
A small three-phase plan with dependencies and two milestones. The quickest way to see what a Gantt chart looks like when it is set up properly.
The standard five-phase schedule with a baseline milestone and two parallel workstreams. The one to take if you want something to run a project from.
Milestone-led and deliberately sparse. Long bars instead of task detail, for reporting progress upwards rather than running the work day to day.
Three weeks of day-level tasks laid out Monday to Friday, for work measured in days rather than months.
Built around how a particular kind of work actually sequences, including the waits you do not control.
Seven phases from permits to practical completion, with the trade sequence linked and the MEP first fix running in parallel.
Discovery through beta to launch, with backend and frontend overlapping and the test plan written during the build.
For a proposal or thesis. Includes the ethics approval wait and a writing-up phase that is actually long enough.
Works back from a fixed date, with the venue booking as the hard gate and a wrap-up phase most event plans forget.
Strategy through to post-mortem, with every asset traced back to the launch date and a QA gate before anything goes live.
Twelve weeks with the go-to-market track running alongside the build, and one launch milestone both tracks feed into.
Smaller charts built to demonstrate one thing clearly rather than to run a project from.
Pick a template and open the preview. You will see the whole schedule laid out on a timeline: phases grouped down the left, each task as a bar showing when it starts and how long it runs, and arrows between tasks that have to happen in order.
When you click Use template, a copy is made in your own account and the whole schedule is shifted so it starts on the coming Monday. The gaps between tasks are preserved, so you get a plan that begins now rather than a set of dates from a demo. From there you can drag bars, change durations, add your own tasks and share the chart.
A Gantt chart is only worth building if it tells you something a task list cannot. Three things do that work:
If you want the background before you pick one, what is a Gantt chart covers the basics, and Gantt chart dependencies explains which tasks are worth linking.